Checking in on the Ankeny ADU project.  Lower and upper floors framed, ridge beam installed (lifted in place via crane from street over existing house), and 2×12 roof rafters going in.  The 2×12 cavities will be filled with open cell spray foam insulation to exceed baseline code energy performance.